Tender Notice: | CONTRACT NRA C.004-031-2018/SS2 INDEPENDENT ROAD SAFETY AUDIT SERVICES FOR THE PEDESTRIAN FACILITIES ON NATIONAL ROUTE 2, SECTIONS 21 AND 22 FROM IZINGOLWENI (N2/21 KM 90) TO MURCHISON (N2/22 KM 18.7) T 1.1 INVITATION FOR QUOTATION TO UNDERTAKE AN INDEPENDENT ROAD SAFETY AUDI CLOSING DATE (AT 11:00): Wednesday, 03 February 2021 SKI Civil and Structural Engineers (Pty) Ltd. were appointed by the South African National Roads Agency SOC Ltd. (SANRAL) for design and construction supervision of pedestrian facilities on National Route 2, Sections 21 and 22 from Izingolweni (N2/21 KM 90) to Murchison (N2/22 KM 18.7). The project is located in the province of KwaZulu-Natal within the Ugu district municipality. The envisaged scope of the works has been established through a visual inspection of pedestrian movement that have formed part of the Employer’s normal business practices. There are substantial numbers of pedestrians mostly school children walking along the N2, from Izingolweni North towards Murchison together with public transport stopping alongside and creating an unsafe environment. The project will be for the construction of walkways and public transportation facilities and will be divided into two works contracts. A Road Safety Audit is therefore required to ascertain the acceptability or not of the proposed design being considered. road safety Only Consulting Engineering Firms with a B-BBEE contributor status level of 1 or 2, are eligible to submit quotations. Firms with road safety and traffic engineering experience are therefore invited to submit a quote to undertake an independent Road Safety Audit. A clarification meeting will not be held, but it is essential that prospective tenderers familiarize themselves with the site. QUOTATION DOCUMENTS Quotation documents are available at no cost in electronic format downloaded from the SANRAL’s website by the following link: https://www.nra.co.za/service-provider-zone/tenders/open-tenders/. Tenderers must have access to Microsoft © Office 2013 and Acrobat Adobe © 9.0 or similar compatible software. Tenderers must submit, via email, the duly completed Form A1.1: Certificate of Intention to Submit a Tender within seven (7) days from the tender advertisement date. Failure to submit this certificate would result in the tenderer not receiving addenda or additional issued information and may result in the tenderer being non-responsive. COMPLETION AND DELIVERY OF QUOTATIONS The closing time and date for submission of quotations is 11h00 on Wednesday, 03 February 2021. Only quotation offers submitted electronically on flash drive and delivered to the address specified in the Tender Data will be accepted. Telegraphic, telephonic, telex, e-mail, facsimile and late tenders will not be accepted. Quotations may only be submitted in the format as stated in the Quotation Data. Queries relating to issues arising from these documents may be addressed to: Mr Shiren Kasipersad Tel No: 076 984 2036 E-mail: shiren@skicivil.co.za THIS DOCUMENT WAS COMPILED BY: SKI Civil and Structural Engineers (Pty) Ltd. P O Box 72727 Lynnwood Ridge 0040 Tel No: 076 984 2036 Fax No: N/A E-mail: shiren@skicivil.co.za Under the direction of: CHIEF EXECUTIVE OFFICER The South African National Roads Agency (SOC) Limited 48 Tambotie Avenue VAL DE GRACE Pretoria 0184 Project Manager: Mr. Andrew Ssekayita Tel No: 033 392 8175 Fax No: N/A E-mail: ssekayitaa@nra.co.za |
Awarded To: | |
BBBEE Points: | |
Full Points Awarded: | |
Approved Contract Amount: | |
Creation Date: | |
last update: | |
Awarded On: | |
Contract Start Date: | |
Contract Duration: |
Opening Time: | 11:00 AM |
Consultant: | SKI Civil & Structural Engineers |
Estimate: | |
Tenders Opened by: | Siyabonga Gwamanda |
Tender Recorded by: | Thobeka Zondi |
In Attendance: | |
Additional Notes: |
Tenderer's Name | Amount Tendered | Alt Tender | Notes |
SMEC SA | R171 062.50 | ||
Mthaliz Trading | R497 500.00 | ||
ARRB Systems SA | R171 637.50 | ||
2Mbeza Construction | R485 700.00 | ||
Undasa Projects | R238 600.00 | ||
Koleko Transportation | R190 313.50 | ||
Chrisen Consulting | R169 337.50 | ||